Project Title: AquaCell Installation Western Michigan

Description: This slide presentation shows an 8 tier AquaCell installation in the winter. The total installed cost was under $9/cubic foot of storage volume. The project was completed in about a week. There are three other AquaCell detention systems to be installed on this project. One of them is very shallow, only 1 tier, demonstrating the design flexibility of this product.

Project Title: AquaCell Installation Western Michigan

Description: This slide presentation shows an 8 tier AquaCell installation in the winter. The total installed cost was under $9/cubic foot of storage volume. The project was completed in about a week. There are three other AquaCell detention systems to be installed on this project. One of them is very shallow, only 1 tier, demonstrating the design flexibility of this product.

Project Title: AquaCell Installation Central Indiana

Description: These slides show an AquaCell installation at a Crew Car Wash project in Central Indiana. The high percentage of volume offered by the AquaCell system made it possible to comply with the detention requirements on the site when other underground detention products wouldn’t.

Project Title: AquaCell Installation Central Indiana

Description: These slides show an AquaCell installation at a Crew Car Wash project in Central Indiana. The high percentage of volume offered by the AquaCell system made it possible to comply with the detention requirements on the site when other underground detention products wouldn’t.